Construction Progress Monitoring: From Periodic Survey to Comparable Record

How recurring aerial capture turns construction progress from a site visit into a measured, comparable time series — illustrated as a workflow.

By GLONAS Engineering Consultant
Share
Construction Progress Monitoring: From Periodic Survey to Comparable Record

Illustrative Workflow

This article describes an illustrative workflow, not a real GLONAS project. No client, project number, accuracy figure or result is claimed.

Problem

Construction progress is reported through site visits, photographs and scattered measurements. The questions that matter — how much was built, is it ahead or behind schedule, does it match design, what was the state on a given date — are hard to answer consistently from a walkaround.

Traditional workflow

Periodic site visits, manual measurement of completed work, and photographs. Useful but inconsistent between visits, sparse on quantities, and weak as evidence in a dispute.

Modern workflow

Recurring aerial capture on a fixed plan, producing a dated, comparable record each epoch.

Technology

  • UAV photogrammetry with RTK/PPK on a repeatable flight plan.
  • Ground control consistent across epochs.
  • Volumetric and area take-off from the DSM and orthomosaic.
  • GIS for as-built vs design and schedule comparison.

Data

  • A per-epoch orthomosaic and DSM, tied to the same datum.
  • Volumetric quantities (cut/fill, stockpiles, placed material).
  • As-built positions of completed elements.

Output

  • A time series of the site: what existed on each date.
  • Quantified progress: volumes and areas completed per period.
  • As-built vs schedule and as-built vs design comparisons.
  • A dated record that supports payment, claims and dispute resolution.

Engineering value

  • Consistency — the same plan each epoch means like-for-like comparison.
  • Quantification — progress in numbers, not impressions.
  • Evidence — a dated, measured record for payment and disputes.
  • Communication — stakeholders see the site, not a report.

Limitations

  • Quantities carry the DSM accuracy; survey-grade control is needed for payment-grade volumes.
  • Weather and access can delay epochs; the plan must allow slack.
  • Comparison depends on consistent processing between epochs.

Lessons learned

  • Fix the flight plan and control at the start; do not change them mid-project.
  • Process every epoch with the same pipeline so differences are real, not artefacts.
  • State accuracy per epoch; do not assume it is constant.

Technical notes

  • State datum, CRS and vertical datum consistently across all epochs.
  • Report per-epoch check-point RMSE.
  • Keep the orthomosaic (visual) and DSM (measured) clearly labelled in every deliverable.