Construction Progress Monitoring: From Periodic Survey to Comparable Record
How recurring aerial capture turns construction progress from a site visit into a measured, comparable time series — illustrated as a workflow.

Illustrative Workflow
This article describes an illustrative workflow, not a real GLONAS project. No client, project number, accuracy figure or result is claimed.
Problem
Construction progress is reported through site visits, photographs and scattered measurements. The questions that matter — how much was built, is it ahead or behind schedule, does it match design, what was the state on a given date — are hard to answer consistently from a walkaround.
Traditional workflow
Periodic site visits, manual measurement of completed work, and photographs. Useful but inconsistent between visits, sparse on quantities, and weak as evidence in a dispute.
Modern workflow
Recurring aerial capture on a fixed plan, producing a dated, comparable record each epoch.
Technology
- UAV photogrammetry with RTK/PPK on a repeatable flight plan.
- Ground control consistent across epochs.
- Volumetric and area take-off from the DSM and orthomosaic.
- GIS for as-built vs design and schedule comparison.
Data
- A per-epoch orthomosaic and DSM, tied to the same datum.
- Volumetric quantities (cut/fill, stockpiles, placed material).
- As-built positions of completed elements.
Output
- A time series of the site: what existed on each date.
- Quantified progress: volumes and areas completed per period.
- As-built vs schedule and as-built vs design comparisons.
- A dated record that supports payment, claims and dispute resolution.
Engineering value
- Consistency — the same plan each epoch means like-for-like comparison.
- Quantification — progress in numbers, not impressions.
- Evidence — a dated, measured record for payment and disputes.
- Communication — stakeholders see the site, not a report.
Limitations
- Quantities carry the DSM accuracy; survey-grade control is needed for payment-grade volumes.
- Weather and access can delay epochs; the plan must allow slack.
- Comparison depends on consistent processing between epochs.
Lessons learned
- Fix the flight plan and control at the start; do not change them mid-project.
- Process every epoch with the same pipeline so differences are real, not artefacts.
- State accuracy per epoch; do not assume it is constant.
Technical notes
- State datum, CRS and vertical datum consistently across all epochs.
- Report per-epoch check-point RMSE.
- Keep the orthomosaic (visual) and DSM (measured) clearly labelled in every deliverable.