Irrigation and Canal Mapping: Aerial Survey for Water Infrastructure
An illustrative workflow for mapping irrigation and canal networks — linear assets where aerial survey trades ground effort for coverage.

Illustrative Workflow
This article describes an illustrative workflow, not a real GLONAS project. No client, project number, accuracy figure or result is claimed.
Problem
Irrigation and canal networks are long, linear assets crossing difficult ground — rice fields, embankments, vegetation. The engineering questions are: what is the alignment, where are the structures (gates, weirs, culverts, bridges), what is the condition, and how does the network relate to the land it serves?
Traditional workflow
Walking the alignment with GNSS and level, supplemented by as-built drawings that are often outdated. Accurate at the points reached, slow over kilometres, and difficult where access is poor or unsafe.
Modern workflow
Aerial capture along the corridor, with ground survey retained for control and structure detail.
Technology
- UAV photogrammetry with RTK/PPK for the orthomosaic and DSM along the corridor.
- UAV LiDAR where vegetation lines the banks and a bare-earth DTM is needed.
- Ground control and check points for metric accuracy.
- GIS for network structure, attribution and condition mapping.
Data
- A corridor orthomosaic at a GSD suited to structure detail.
- A DSM/DTM for grading, flow and embankment assessment.
- Structure positions and types derived from the orthomosaic.
Output
- A mapped network: alignment, structures, condition flags.
- A survey-grade orthomosaic and surface model tied to a stated datum.
- A baseline for condition monitoring between visits.
Engineering value
- Coverage — the whole corridor measured, not sampled.
- Access — embankments and wet ground captured without walking.
- Structure inventory — gates, weirs and culverts located and attributed.
- Monitoring — recurring flights compare condition over time.
Limitations
- Water surfaces are poor for photogrammetric matching; LiDAR or control is needed at waterline.
- Vegetation along banks may require LiDAR for a clean DTM.
- Accuracy still depends on control; without it the product is visual.
Lessons learned
- Fly a consistent corridor plan each epoch for like-for-like comparison.
- Pair RTK with check points along the alignment.
- Attribute structures in GIS against a naming standard the operator uses.
Technical notes
- State datum, CRS and vertical datum on every deliverable.
- Report accuracy as check-point RMSE.
- Distinguish the visual orthomosaic from the measured DSM/DTM.