Solar PV Site Survey: Aerial Mapping for Utility-Scale Solar
An illustrative workflow for aerial survey of a utility-scale solar PV site — the problem, the traditional approach, and what modern capture changes.

Illustrative Workflow
This article describes an illustrative workflow, not a real GLONAS project. No client, project number, accuracy figure or result is claimed.
Problem
A utility-scale solar PV site covers hundreds of hectares of repeating geometry — rows of panels, access tracks, inverter stations, fencing and drainage. The engineering questions are: what is the terrain, where do the rows sit, what is the as-built layout versus design, and how is the site progressing?
Traditional workflow
Ground topographic survey with total station and GNSS, supplemented by manual panel checks. Accurate but slow over large areas, and it samples rather than covers — the space between measured points is inferred.
Modern workflow
Aerial capture replaces the ground survey for the area-consuming parts, with ground survey retained for control and critical detail.
Technology
- UAV photogrammetry with RTK/PPK for the orthomosaic and DSM.
- Ground control points and check points for metric accuracy.
- Optional UAV LiDAR where vegetation or low texture affects photogrammetric matching.
- GIS for layout comparison and progress tracking.
Data
- Orthomosaic at a GSD suited to panel-level detail.
- DSM/DTM for grading and drainage design.
- As-built panel positions derived from the orthomosaic.
Output
- A survey-grade orthomosaic and surface model, tied to a stated datum.
- An as-built layout versus design, with deviations flagged.
- A progress baseline that subsequent flights compare against.
Engineering value
- Coverage — the whole site measured, not sampled.
- Speed — area captured in hours versus days on the ground.
- Record — each flight is a dated, revisitable baseline.
- Comparison — design vs as-built, and epoch vs epoch for progress.
Limitations
- Photogrammetry needs texture and overlap; reflective panel surfaces can be weak.
- Vegetation around the site may require LiDAR for a clean DTM.
- Accuracy still depends on control; without it the product is visual, not metric.
Lessons learned
- Specify GSD against the smallest feature that matters (panel edge, post).
- Pair RTK with a small GCP/check-point set — do not skip validation.
- Fly a consistent plan each epoch so progress comparison is like-for-like.
Technical notes
- State the datum, CRS and vertical datum on every deliverable.
- Report accuracy as check-point RMSE, not as an assertion.
- Keep the visual layer (orthomosaic) and the measured layer (DSM/DTM) clearly labelled.