Quantity & Cost Estimation
Quantity take-off, BOQ preparation and cost estimation from engineering drawings — accurate, itemized budgets for tender and cost control.

Quantity and cost estimation turns engineering drawings into an itemized bill of quantities and cost estimate — the budget basis for tender, procurement and cost control.
Overview
Quantity and cost estimation is the bridge between a design and a defensible budget. GLONAS performs quantity take-off directly from the engineering drawings we produce — measuring earthwork, concrete, steel, pavement, drainage and utilities item by item — and assembles them into a bill of quantities (BOQ) with unit rates and a total cost estimate. Rates are built from current material, labour and equipment pricing, adjusted for location and project conditions, so the estimate reflects what the work will actually cost to execute. The BOQ is structured for tender use, with clear item descriptions and units, and can be re-baselined during construction for cost control and variation management. The result is an itemized, auditable budget that supports competitive tendering and disciplined project delivery.
Scope of Services
- Quantity take-off from engineering drawings
- Bill of quantities (BOQ) preparation
- Unit rate build-up and pricing
- Total cost estimation
- Tender BOQ structuring
- Cost control and variation baselining
Key Benefits
- Itemized, auditable budget
- Current location-adjusted rates
- Tender-ready BOQ
- Cost control baseline
Applications
- Construction tendering
- Project budgeting
- Procurement
- Cost control and variations
Industries
- Construction
- Infrastructure
- Property
- Industrial
- Government
Methodology
Take off quantities from drawings, build unit rates from current pricing, assemble the BOQ with item descriptions and units, compute the total estimate, and structure for tender and cost control use.
Equipment / Technology
Quantity take-off and CAD measurement tools, cost databases, spreadsheet BOQ, market rate references.
Deliverables
Technical Specifications
Input: engineering drawings | Output: itemized BOQ + cost estimate | Rates: current, location-adjusted
Workflow / Process
1. Drawing-based take-off
2. Unit rate build-up
3. BOQ assembly
4. Total cost estimate
5. Tender & cost control structuring
FAQ
Q: Are rates based on current prices?
A: Yes — unit rates are built from current material, labour and equipment pricing, adjusted for location.
Estimate your project cost
Tell us the drawings and scope for a quantity and cost estimation proposal.